27th March 2015

Outsourcing helps Ishida Europe increase capacity and boost sales

A strategic decision to outsource part of its production has helped Ishida Europe double its capacity and achieve significant growth in the process.

The company, which has sites in the West Midlands and Poole, turned to PP Electrical Systems to help it ease capacity issues and improve lead times offered to its global customer base.

What started as the supply of electrical harnesses has now been transformed into a long-term partnership, which sees the Walsall based control and automation specialist oversee the base build of the multi-head food weighers, including building and fitting all associated controls.

These are then delivered to Ishida on a just-in-time (JIT) schedule for the final fit and bespoke configuration before being sent to clients supplying some of the world’s biggest supermarkets.

“We used to try to do as much of the assembly as possible in-house, but that was causing us issues with increased lead times and being able to keep up with demand,” explained John Priest, Operations Director at Ishida Europe.

“This made us consider our approach to outsourcing and, after we saw what PP Electrical Systems was doing for some of its other customers, we invited the company in to see how it could work with us more strategically.”

He continued: “Results have been emphatic. We proved the outsourcing arrangement worked with multi-head weighers and then adopted it for other product lines, such as our innovative tray sealing machines.

“The impact of strategic outsourcing and a number of additional activities has delivered growth of 20% year-on-year since 2012. This has enabled us to employ 75 more people, and, in recognition of this achievement, we were awarded the Queens Award for Enterprise – International Trade in 2014.”

PP Electrical Systems is creating an enviable reputation for working with Original Equipment Manufacturers (OEMs) looking to replace 100% vertical integration of production by sub-contracting out non-core competencies.

It’s state-of-the-art 40,000 sq ft facility in the West Midlands operates lean manufacturing and six sigma principles and – coupled with more than £1million of investment in automation for cable preparation – provides world class connectivity and quality to its customers.

Experienced engineering teams work with clients from the start of the process, identifying areas where they can add value and offer potential cost savings.

Tony Hague, MD of PP Electrical Systems, picked up the story: “Ishida Europe is a great example of how outsourcing can really make a difference to machinery manufacturers.

‘We have been providing the high ‘added value’ machine base build solution for more than 5 years now, gradually working our way up so that we are now involved in numerous variations of multi-head weighers.

“As well as the complex assembly and fit, we also look after the logistics and supply chain management, meaning our customer now deals with one strategic source directly rather than many individual component suppliers and the associated costs that go with managing them.”

He went on to add: “Outsourcing – when the right partner is selected – offers many benefits. It can eliminate unnecessary stock and reduction in work in progress, improves cash flow and should improve production throughput times. The latter reduces customer lead times, which in turn can assist in securing new orders.

“Importantly, it can also give you flexibility in capacity and that works equally well when volumes are ‘up’ or ‘down’, reducing the need for costly sub-contract labour as a reaction to increased build requirements and, equally, the issue of managing short working hours or some form of “lay offs” in quieter periods.”

A recent example of the partnership evolving has been Ishida successfully securing an order for 40 customised multi-head food weighers into twelve different locations, including Europe, Japan and North America.

This involved ensuring each machine was certified to CE and UL508a standards, a challenge PP Electrical played a major role in meeting.

John concluded: “Outsourcing non-core assembly has been a major success for us and we are keen to move forward with this approach. We’re looking at introducing new model launches over the next twelve months and PP Electrical Systems will be instrumental in that process.”

More Details on Ishida Europe can be found at www.ishidaeurope.com

More thought-leading content

Grid expansion electrifies PP C&A’s move into the energy market with £20m order haul

One of the UK’s leading strategic manufacturing specialists is tapping into the UK’s unprecedented investment in upgrading the electricity grid.

The Great Grid Upgrade’s hidden bottleneck: protection and control capacity

As Britain accelerates investment in grid infrastructure, protection and control capacity could become a critical delivery constraint.

CEO commentary on Burnham’s economic direction

The appointment of a new Prime Minister inevitably brings renewed debate about the direction of the UK economy and what it could mean for business.

PP Control & Automation calls for a more practical approach to AI adoption in manufacturing

Ian Knight, Chief Information Officer at PP Control & Automation (PP C&A) challenges the prevailing, often vague narrative around AI adoption and reframes the conversation around a more practical starting point: operational constraints.

Smart Manufacturing Week 2026: AI & data in manufacturing panel

Artificial intelligence is no longer a distant concept for manufacturers. It is already being explored across quotation, production planning, engineering, quality, supply chain and customer service functions. Yet, for many organisations, the gap between experimentation and meaningful operational impact remains difficult to close.

Manufacturing deal set to help fish vaccination specialist scale-up

A leading aquaculture specialist – that is changing the way fish are vaccinated safely – has signed a major manufacturing deal.

The assembly advantage: how integrated assembly reduces handoffs, delays and supply chain friction

On paper, defined discipline-specific suppliers can look organised. However, every additional supplier introduces another handoff, and every handoff creates another point where time, quality, communication and accountability can be lost.

Five signs your manufacturing partners are no longer fit for purpose

Very rarely does growth not surface because an OEM lacks ambition. Shortcomings arise because operating models built to support such ambition don’t evolve quickly enough.

Unlock your growth potential. Explore key services

Do you outsource?

    Realise your growth potential by making outsourcing part of your manufacturing strategy.

    At PP C&A, we never assume that a solution for one customer will work for another, because every customer is unique. That is why we will never try to simply sell you an ‘off the shelf solution’.

    We believe in meeting you, listening and understanding your needs first. If you are considering outsourcing for the first time or you wish to review your current outsourcing strategies, we would welcome the opportunity for discussion





    1. Do you outsource?

    If yes
    Do you outsource to multiple suppliers?

    2. Are you considering outsourcing or considering changing supplier?

    3. Are you experiencing barriers to growth?


    4. Would you like to arrange a consultation (call or visit) with us?

    5. Would you like to receive more information on strategic outsourcing?

    6. If you have a more specific enquiry, question or pain point, please let us know: